Use Case for AgilePM

Written by Himanshu Jain

Last modified May 5, 2025

Facebook
Twitter
LinkedIn

Table of Contents

Scenario: Development of a Smart Infotainment System

Context: A car manufacturer wants to develop a next-generation infotainment system, integrating features like voice control, navigation, and smartphone connectivity. The project involves software development, user interface design, and hardware integration.

How AgilePM Works:

  • Project Flexibility: AgilePM allows iterative development, prioritising features like navigation and voice control early, while refining less critical features (e.g., ambient light control) in later increments.
  • Customer Collaboration: Continuous engagement with internal stakeholders, such as product owners and design leads, ensures the system meets user expectations.
  • Delivery Focus: The project delivers a working prototype of the core system by the end of Sprint 4, enabling early testing in prototype vehicles.

Key Benefits:

  • Faster time-to-market for core functionality.
  • Early feedback from engineers and testers in simulated driving conditions.
  • Reduced risk of late-stage failures by iterating on software and hardware integration.

Use Case for PRINCE2

Scenario: Building a New Assembly Line for Electric Vehicles (EVs)

Context: The company is setting up a new assembly line for its upcoming electric vehicle range. This involves extensive planning, procurement, infrastructure development, and equipment installation.

How PRINCE2 Works:

  • Structured Approach: The project follows PRINCE2’s clearly defined stages: Initiation (feasibility study), Planning (resource allocation, timeline definition), Execution (infrastructure build and equipment setup), and Closure (handover to operations).
  • Risk Management: Identifies risks such as delays in equipment delivery or regulatory changes affecting the assembly process.
  • Change Management: Any alterations to the assembly line specifications are assessed for impact on cost, schedule, and quality.

Key Benefits:

  • Clear governance ensures accountability across project stages.
  • Regular stage reviews allow senior management to approve funding and progress, reducing risks of overruns.
  • Detailed documentation ensures compliance with automotive manufacturing regulations.

Use Case for Hybrid Approach

Scenario: Launch of a New Hybrid Vehicle Model

Context: The company is designing and producing a new hybrid car, which combines the need for iterative software development (e.g., battery management system) with traditional manufacturing workflows (e.g., chassis production).

How Hybrid Works:

  • Agile for Software Development: The battery management system and driving modes (Eco, Sport, etc.) are developed using AgilePM. Regular sprints focus on testing and refining these systems in real-world scenarios.
  • PRINCE2 for Manufacturing: The physical car manufacturing process, from tooling to final assembly, follows PRINCE2’s structured approach to ensure timelines, costs, and quality are tightly controlled.
  • Integration Points: Regular checkpoints between software and hardware teams ensure that digital and physical components align seamlessly. For instance, software updates are tested on pre-production cars before assembly line integration.

Key Benefits:

  • Agile ensures rapid iteration and innovation in software design, keeping pace with technology trends.
  • PRINCE2 provides structure for the manufacturing process, ensuring on-time delivery and compliance with automotive standards.
  • Integration of both methods reduces risks of misalignment between software and hardware teams, leading to a smoother production launch.

Summary:

  • AgilePM: Best for innovative and flexible projects like software or tech development.
  • PRINCE2: Ideal for traditional, large-scale, and predictable initiatives like infrastructure or assembly line setup.
  • Hybrid: Perfect for complex projects requiring both innovation (software) and predictability (manufacturing).

This approach ensures flexibility where needed while maintaining control over established processes.

More from the blog

Use Case for AgilePM

Can Prince2 and AgilePM work together?

AgilePM vs. PRINCE2: Paving Your Path in Project Management

Continuous Professional Development: The Pivotal Enabler for Career Growth in a Dynamic World

Agile Project Framework: An Enabler for Enhanced Project Success and Why You Should Consider AgilePM Certification